    Shane Chapman - Saturday 30 June 2022

    Start Your Deck on a Solid Foundation

    Deck Footing TypesPeople don't typically pay much attention to what's underneath their deck. But if you think about it, the footings supporting the deck are carrying thousands and thousands of pound of weight. And what's on your deck, is valuable - BBQ, patio furniture - OH, and your children, elderly parents, friends, and family.

     

    So it's very important that every structural component of your deck is built safe and strong. And the first structural component in the process of building a deck is the footings.

     

    Traditionally, these footings were most commonly concrete piles. But over the last decade or two, new products and advancements have been made to address the issues of concrete piles: they're a ton of work, they're messy, they're expensive, and if not done correctly, they simply don't work and can be the first cause of failure.

     

    In many markets, smaller or lower decks do not required concrete piles. Instead they can be installed with footings resting ON the ground as opposed to in the ground. Check your local building department to see when and where these options might be okay.

     

    At The Ultimate Deck Shop, with our two stores in Saskatchewan, we have many footing options available, but two are easily the most common over the others: GH Levellers and Helical Screw Piles.

     

    Below is four common footing options that are available at The Ultimate Deck Shop (however, concrete for large concrete piles should come from a concrete plant). These all have their purpose, but this chart should help you to figure out which one is right for YOUR project:

     

    GH Leveller

    SHOP HERE

    Pylex Screw Pile

    SHOP HERE

    Concrete PileHelical Screw Pile
    Who InstallsDIYDIYHire it OutHire It Out
    Cost$$$$$$$$$$$
    Ease of InstallEasyMediumHardEasy
    Wind Uplift ResistanceNone with typical install.None with typical installYesYes
    Frost Heave ResistanceNone, but adjustable.None, but adjustable.YesYes
    Typical Install ProcessExcavate grass or loose soil about 3-4 inches. Add approx 1" of sand or gravel for leveling. Add 16x16x2" concrete slab. GH Leveller rests on slab.Twist light duty screw pile into the ground using a heavy impact wrench or manually with a 2x4.Excavate hole to a depth suitable for your area (Saskatchewan 14-18 feet). Haul excavated earth away to a dump site. Insert sono-tube concrete form. Fill hole with concrete to above grade. Insert or attach post saddle.Heavy duty screw pile is driven in hydraulically with machinery.
    Tools RequiredShovel, drill, spade bit.2x4 or heavy impact wrench.Heavy machinery with large auguer, extensions, and bucket for removal of earth. Possible dump truck.

    Typically subcontracted.
    Machinery with hydraulic drive.

    Subcontracted.

    Learn more about decks than you ever thought you needed to know...

    Recent Articles

    Compare 0

    Add another product (max. 5)

    Start comparison

    Please accept cookies to help us improve this website Is this OK? YesNoMore on cookies »